FUEL OIL LINES

   BALPET WORK
   4930 m of steel tube and 3.5 tons blocks of BALPET were installed between 26.01.2008 and 22.02.2008.  18 bar of steel tube was tested  and work was completed.
Views of Work
 


   SOİL-SİYAM
   Producing 10" steel tube of SİYAM PETROLEUM and installation under sea. Installation of 10" 3860 m steel tube and connecting 10"steel tube of SOIL-SIYAM PETROLEUM between 11.08.2006 and 15.09.2006.
Views of Work
 


   TUBE FLOTATION-INSTALL-UNINSTALL
   Installation of 12" steel tube of ALPET CO. Sinking and connecting of 12" steel tube under sea on area of Mersin Soda.
Views of Work
 


    WORK
    Collector producing for ALPET CO. Producing and installation of 16” ve 12” collector of ALPET CO. of which buoy system is on area of Kromsan Soda on 12.03.2008.
Views of Work
 


  POAS WORK

Views of Work
 


   SIYAM WORK
   Installation of 12" steel tube line on area of Soda.
Views of Work
 


   SOIL WORK
  Installation of 12" steel tube line on area of Soda.
Views of Work